Testing and Commissioning
Commissioning
Testing, validation and commissioning activities carried out on site or in laboratory environments for railway, metro and tram signalling systems.
We support testing and commissioning activities throughout the entire project lifecycle, from initial stages through to operational handover. Covering every phase (FAT, SIT, SAT and SATOV), we provide both on-site and laboratory support for the commissioning of IXL, ATP and TMS systems.
Overall-Site Post-Commissioning Support
Post-commissioning support service delivered either on-site or remotely to assist customers during the first days of operation. The service provides operational guidance and rapid response to any requirements that may arise during the initial operational phase of the system.
ATS Commissioning
On-site and laboratory testing of metro TMS/ATS systems, from document review and analysis through to final acceptance testing with the customer.
Hardware and Software FAT Support
Support for Factory Acceptance Tests (FAT) to validate hardware and software products related to the above-mentioned technologies.
SCMT Commissioning
Installation of SCMT balises, on-site and laboratory testing to verify compliance with the signalling system configuration (ACEI or ACC), as well as configuration and commissioning of both onboard and trackside equipment.
IXL/ACEI Commissioning
On-site testing of trackside equipment, including control room verification and configuration for both relay-based interlockings (ACEI) and computer-based interlockings (ACC), up to the calibration of AFO track circuits.