{"id":8178,"date":"2023-02-19T20:39:56","date_gmt":"2023-02-19T19:39:56","guid":{"rendered":"https:\/\/www.tesifer.it\/portfolio\/glasgow-handling\/"},"modified":"2026-09-18T11:47:58","modified_gmt":"2026-09-18T09:47:58","slug":"glasgow-handling","status":"publish","type":"cpt_portfolio","link":"https:\/\/www.tesifer.it\/en\/portfolio\/glasgow-handling\/","title":{"rendered":"CBTC Signalling Renewal &amp; Automation \u2013 Glasgow Subway"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">The Challenge<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This brownfield project involved the complex replacement of the entire signalling system of the Glasgow Subway while maintaining the existing infrastructure, with the goal of introducing a fully automated, driverless CBTC technology.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"954\" data-id=\"7791\" src=\"https:\/\/www.tesifer.it\/wp-content\/uploads\/2026\/05\/Glasgow-1024x954.jpg\" alt=\"\" class=\"wp-image-7791\" srcset=\"https:\/\/www.tesifer.it\/wp-content\/uploads\/2026\/05\/Glasgow-1024x954.jpg 1024w, https:\/\/www.tesifer.it\/wp-content\/uploads\/2026\/05\/Glasgow-300x279.jpg 300w, https:\/\/www.tesifer.it\/wp-content\/uploads\/2026\/05\/Glasgow-768x715.jpg 768w, https:\/\/www.tesifer.it\/wp-content\/uploads\/2026\/05\/Glasgow-1536x1430.jpg 1536w, https:\/\/www.tesifer.it\/wp-content\/uploads\/2026\/05\/Glasgow-370x345.jpg 370w, https:\/\/www.tesifer.it\/wp-content\/uploads\/2026\/05\/Glasgow-840x782.jpg 840w, https:\/\/www.tesifer.it\/wp-content\/uploads\/2026\/05\/Glasgow-410x382.jpg 410w, https:\/\/www.tesifer.it\/wp-content\/uploads\/2026\/05\/Glasgow.jpg 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Our Contribution<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">On behalf of Hitachi, Te.Si.Fer. managed the complete installation engineering lifecycle, ensuring the seamless integration of all complex project subsystems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key activities included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Installation engineering for CBTC systems, including ATS, ATP, ATO and O&amp;M subsystems.\u00a0\u00a0<\/li>\n\n\n\n<li>Subsystem coordination and compliance verification activities supporting system commissioning and handover.<\/li>\n\n\n\n<li>End-to-end project execution, from on-site surveys and data collection through detailed design to As-Built documentation.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Outcome<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The project enabled the modernization of two railway loops, covering a total of 20 km and 15 stations, supporting the transition to a state-of-the-art, fully automated metro system capable of safely operating the new rolling stock fleet.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Brownfield migration to a fully integrated CBTC system, enabling the complete automation of the Glasgow Subway network.<\/p>\n","protected":false},"author":1,"featured_media":8179,"template":"","cpt_portfolio_group":[140],"class_list":["post-8178","cpt_portfolio","type-cpt_portfolio","status-publish","has-post-thumbnail","hentry","cpt_portfolio_group-sviluppo-software"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.tesifer.it\/en\/wp-json\/wp\/v2\/cpt_portfolio\/8178","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tesifer.it\/en\/wp-json\/wp\/v2\/cpt_portfolio"}],"about":[{"href":"https:\/\/www.tesifer.it\/en\/wp-json\/wp\/v2\/types\/cpt_portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.tesifer.it\/en\/wp-json\/wp\/v2\/users\/1"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tesifer.it\/en\/wp-json\/wp\/v2\/media\/8179"}],"wp:attachment":[{"href":"https:\/\/www.tesifer.it\/en\/wp-json\/wp\/v2\/media?parent=8178"}],"wp:term":[{"taxonomy":"cpt_portfolio_group","embeddable":true,"href":"https:\/\/www.tesifer.it\/en\/wp-json\/wp\/v2\/cpt_portfolio_group?post=8178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}